The list can be filtered by task state (draft, started or finished), and can be sorted by priority, start date or due time.
可以按任务状态(草案、已启动或已完成)对该列表进行筛选,并且可以按优先级、启动日期或到期时间排序。
Draft must be negotiated in China within 15days from the date of Bill of Lading but not later than 15th July 2001.
汇票需自提单日期起15天内在中国议付,但不得超过2001年7月15日。
The controls provide good flexibility: You can set a blog entry to be published immediately or on a future date or save it as a draft.
这种控制提供了很好的灵活性:您可以设置blog条目是立即发布,还是在将来的某个日期发布,抑或是保存为草稿。
应用推荐